7Days Kilimanjaro Climb Machame Route
Arrival at Kilimanjaro airport and then transfer to Arusha Overnight in hotel.
DAY 1
Arusha – Machame Village – Machame Camps
The begins of 11-Days Kilimanjaro climb And Safari, Drive to Kilimanjaro Park Machame gate, 5-7 hours hike (10km). 1200 meters ascent to an altitude of 3000 meters.
DAY 2
hike to Shira Camps
Today we have a 6km hike, during 5-7 hours. We will have an 840 meter ascent and reach the 3840 meters of altitude. Overnight will be served at Shira camp.
DAY 3
hike to Barranco Camps
Today we have a long hike of 10km (5 / 7 hours) but with a small ascent of just 110 meters. By night, we’ll be sleeping at 3950 meters. Overnight at Barranco camp.
DAY 4
Hike to Karanga Valley camps
4.5km hike during just 3 hours. We will finally be sleeping above 4000 meters, at 4200 meters above sea level (250 m ascent). Dinner / Overnight at Karanga Valley camp.
DAY 5
Hike to Barafu Camp
Again, 4.5km hike during just 3 hours. Today we’ll reach an altitude of 4700 meters (500 High ascent) for the highest night of your journey. Dinner and the Overnight at Barafu camp.
DAY 6
Barafu – Uhuru Peak – Mweka
We will wake up very early, during the night, in order to arrive to the peak at sunrise. When you reach the summit, you will be at 5986 meters and have the best views of your entire life.
After some time at the summit, we’ll start our descent to Mweka. Dinner plus Overnight at Mweka Camps
DAY 7
Mweka camp – Mweka Village – Arusha
In our last day, we’ll have a 3/4 hours hike of 10 kilometers (to an altitude of 1600 meters) before driving to Kilimanjaro airport or Arusha. This mark the end of 7 Days climbing Kilimanjaro.
End of a 7Days Kilimanjaro Climb Machame Route